Soinn hotel

With a nod to creating unparalleled experiences, the last floor of the "Soinn" hotel posed a unique challenge, yet the outcome was immensely gratifying. This project stands as one of the many in a series of exceptional ventures undertaken, resulting in a stunning blend of beauty and functionality. made only in 20 days with an engineeringly challenging timeline

The design of the last floor artfully showcases the most attractive views, with each element meticulously crafted to highlight the inherent beauty of the space. This accomplishment is part of a broader portfolio that includes various resorts and hotels, each project contributing to an overarching legacy of remarkable architectural achievements.

01

References:
1. Engr. Hisham Fathy +201002760049
2. Suma bay Stuff of year 2021

02

Storage Units

This project marked a profound breakthrough in construction methodology, thanks to the innovative approach to concrete pouring applied by Dr. Atef Shehata. Instead of applying the concrete all at once, he strategically addressed the floors area by area. This method not only showcased his ingenuity but also garnered admiration from the workers, who applauded his intelligent solution.

The impact of Dr. Shehata's approach was clearly evident when nearby storage units, which had not employed his technique, began to experience floor cracking. In contrast, the floors in the project he led remain stable and reliable, ensuring that the storage units are now used safely and effectively.

References:
1. Mr. Maged Nassar +201281010569
2. Engr. Maged +20122385902

03

The Gouna Marine

The marine project in El Gouna, Hurghada, stands as one of the most captivating developments in our portfolio, with both the design process and the final outcome exceeding expectations from a professional standpoint. This prestigious waterfront complex has transformed into a high-end destination within the heart of El Gouna. Strategically positioned along Egypt's Red Sea coast, the project seamlessly integrates with its surroundings while managing to catch the eye. Dr. Atef Shehata led the full consulting and design efforts, including the complete piles and the critical linkage connecting the lagoon to the sea. The client's vision was to create a space that exuded luxury and drew visitors, a goal that has been resoundingly achieved. Our signature approach of blending functionality with aesthetic appeal is evident throughout. Since its completion, the project has become a magnetic draw for tourists and locals alike, offering a unique coastal experience that sets a new standard for luxury in El Gouna.

References:
1. Engr. Samuel Hanna +201223290516
2. Engr. Girgis Ghattas +201227322590
3. Engr. Mikhaeel Marco +201222756542

04

Marine Sheraton

The Red Sea coastal protection project stands as one of our most innovative and challenging developments, pushing the boundaries of engineering and aesthetic design. This ambitious undertaking along Egypt's stunning shoreline presented unique obstacles, balancing robust seawater defense with the preservation of breathtaking views and stringent safety standards. Our ingenious solution involved creating an artificial support wall using sand-filled bags, allowing work to proceed unimpeded by tidal forces within a constrained budget. The result is a structure that seamlessly blends functionality with the natural beauty of the Red Sea coast, offering both protection and panoramic vistas. Since its implementation, this innovative technique has garnered widespread acclaim throughout the region, setting a new standard for coastal engineering projects in Hurghada and beyond.

References:
1. Engr. Girgis Ghattas +201227322590
2. Engr. Mikhaeel Marco +201222756542

05

Eldau Strand

In this project, the focus was on creating a tourist facility where the design and implementation of the piles, waterproofing, and dewatering systems played a crucial role. Each element was meticulously planned and executed, ensuring that the structural integrity and longevity of the facility were maintained. This project stands as a testament to the importance of thoughtful engineering and precise execution, contributing to the creation of a safe and enduring tourist destination.

References:
1. Engr. Ramy +201205030789
2. Engr. Maged +20122385902
3. Engr. Mamdouh EL-Shayeb +21227022707
4. Engr. Bishoy Ghattas +201273932591

06

50m Tank

The project involved revitalizing a severely deteriorated tank, which had leaks throughout its structure. Comprehensive designs were developed to address these issues, and the implementation was carried out to the highest standards. The meticulous approach ensured that the tank was restored to optimal condition, with a guarantee of long-lasting durability and performance.

References:
1. Engr. Ahmed Nafea +201222391698
2. Engr. Otham Mohamed +201223738696
3. Engr. Mahmoud Fekry +201221015558

07

New Sabina Bridge

The challenge with this bridge project was its proximity to an existing villa, which posed significant risks during construction. Careful planning and design were essential to mitigate these risks. We developed and implemented appropriate solutions, including a method for stabilizing the excavation sides adjacent to the villa. The execution was successful, ensuring that the villa remained unharmed and free from any damage throughout the project.

References:
1. Engr. Girgis Ghattas +201227322590
2. Engr. Mikhaeel Marco +201222756542

08

Vanadir Bridge

This project involved the construction of a bridge supported by piles. The design, drying, and implementation of the bearing piles were carried out with precision, utilizing a board pile system. The project successfully integrated these elements to ensure a robust and reliable foundation for the bridge.

References:
1. Engr. Girgis Ghattas +201227322590
2. Engr. Mikhaeel Marco +201222756542

09

Renovations of Elkasr Elakhdar

This project involved buildings that had been marked for demolition due to their imminent collapse. Instead, a restoration was undertaken, renewing the structures and extending their lifespan indefinitely. It was one of the most challenging and critical projects, as any misstep could have endangered lives, given the buildings were on the brink of failure. Through careful restoration, the risk was eliminated, ensuring the buildings now stand safe and secure for the future.

References:
1. Mr. Hussein Abbas +201003585894

10

Renovation Of Sewage Station

This project centered on the reinforcement and rehabilitation of a sewage treatment station. The process involved careful planning and execution to ensure the facility's structural integrity and long-term reliability. The station was successfully restored and guaranteed for a lifetime of efficient operation, making it a critical improvement to the infrastructure.

References:
1. Engr. Ahmed Nafea +201222391698
2. Engr. Otham Mohamed +201223738696
3. Engr. Mahmoud Fekry +201221015558